Skip to the content
Peabody Teach

Share

This page

Peabody is free and has no ads. Sharing it is the best way to help.

Grade 8 scientific practices: Bridges, drones and big builds

A reading on trade-offs, models and decision matrices, a paper bridge strength-per-sheet activity and three practice sheets, with a check and a key.

Grade 8 · 50 minutes · worksheet

Reading: no design is perfect

Name ______________ Date ____________

How can a bridge made of paper hold a heavy load? No design is perfect, so engineers weigh trade-offs. A trade-off is giving up some of one good thing to gain another. A thicker beam is stronger, but it is heavier and costs more. A drone with strong parts can carry more, but strong parts weigh more, so its battery runs down faster. Engineers list criteria, what a design must do, and constraints, the limits on materials, cost and time. Then they compare designs against both.

Engineers use models to test ideas before they build the real thing. A model can be a drawing, a computer program or a small copy called a scale model. Models are cheaper and safer than full-size tests. But models have limits. A small model may not act like a large structure, because weight grows faster than strength as a structure gets bigger. So engineers check a model against real tests.

A decision matrix helps compare designs. List the criteria, give each design a score for each one, and add the scores. Each score is a judgment, so the best design depends on what matters most. Tests give data to back up the scores. When a test fails, engineers find the failure point, change one part and test again. Repeating this cycle of testing and improving is called iteration.

WordMeaning
trade-offGive up one good thing to gain another
criteriaWhat a design must do
constraintA limit on materials, cost or time
modelA drawing, program or copy used to test
scale modelA small copy of a larger object
decision matrixA table that scores designs
iterationRepeating a cycle of test and improve

Activity: strength per sheet

Materials: scissors, tape, six sheets of paper, two stacks of books set 20 cm apart, about 80 pennies. Steps: 1. Build Design A from one sheet, Design B from two sheets and Design C from three sheets. Each must span the gap. 2. Add pennies one at a time in the middle until the bridge bends to the table. 3. Record the pennies held. 4. Divide pennies by sheets to find the pennies per sheet. 5. Improve your best design and test it again.

StepWhat to doSafety
1Cut and tape the paperUse scissors only; an adult is nearby
2-3Add pennies one at a timeKeep the load low to the table
4Divide to find pennies per sheetDo not lean over the bridge
EndCollect pennies and paperWash your hands when you finish
DesignSheetsPennies heldPennies per sheet
A1
B2
C3

Which design was strongest overall? Which used paper best? What did you give up?

Practice 1: recall

Picture word: a see-saw. Adding weight to one side takes it away from the other. A trade-off is like a see-saw.

Draw a see-saw with strength on one side and weight on the other.

Choose the best answer.

  1. A trade-off isa) giving up some of one thing to gain anotherb) a test that always worksc) a kind of bridge
  2. Criteria area) limits on costb) what a design must doc) the data from a test
  3. A constraint isa) a goal for strengthb) a scale modelc) a limit on materials, cost or time
  4. A scale model isa) a small copy of a larger objectb) a full-size buildc) a list of scores
  5. A decision matrixa) draws a bridgeb) scores designs against the criteriac) measures force
  6. Iteration meansa) testing only onceb) building the final designc) repeating a cycle of test and improve

Practice 2: apply

Choose the best answer.

  1. A drone arm is made thicker. It is stronger but heavier. This shows aa) trade-off between strength and weightb) constraint on timec) failed test
  2. Bridge A held 24 pennies with 2 sheets. How many pennies per sheet?a) 24b) 12c) 48
  3. Bridge A held 24 pennies with 2 sheets. Bridge B held 30 with 3 sheets. Which used paper better?a) Bridge B, with 10 per sheetb) They used paper equallyc) Bridge A, with 12 per sheet
  4. Design X scores 3, 4 and 2. Design Y scores 4, 3 and 3. Which is best by the matrix?a) Design Y with 10b) Design X with 9c) They tie
  5. A model bridge holds a big load. What should the team do next?a) Skip any further testingb) Check it with a real test, since models have limitsc) Make the model smaller
  6. A test shows a bridge fails at a joint. What is the next step?a) Stop the projectb) Test a different bridgec) Change the joint and test again

Practice 3: explain and compare

Choose the best answer.

  1. Why is no design perfect?a) Improving one criterion often costs anotherb) Engineers are carelessc) Tests never work
  2. Why use a model before a full-size build?a) Models are always exactb) It is cheaper and safer to testc) Models cannot fail
  3. Why might a small model not act like a big structure?a) Small models have no weightb) Big structures have no limitsc) Weight grows faster than strength as size grows
  4. Why can two teams pick different best designs?a) They may give different importance to the criteriab) One team ignores datac) Matrices always tie
  5. Why does iteration improve a design?a) It makes the first design perfectb) Each test shows a weakness to fixc) It removes the need for criteria
  6. How are criteria and constraints different?a) They mean the sameb) Constraints are goals; criteria are limitsc) Criteria are what a design must do; constraints are limits

Check

True or false, then choose.

  1. A perfect design never needs a trade-off.TrueFalse
  2. A scale model is a smaller copy used for testing.TrueFalse
  3. Iteration means testing a design only once.TrueFalse
  4. A decision matrix scores designs against criteria.TrueFalse
  5. Which is a constraint?a) The bridge should be strongb) Only two sheets of paper are allowedc) The bridge should be useful
  6. A model can have limits that a real test shows.TrueFalse
  7. Name one trade-off in designing a drone.

Made with Peabody Teach, free printables for teachers: teach.peabody.kids. No sign-in, no ads.

Teacher copy with the answer key

Leer esta página en español

Last checked 2026-11-15. Every answer in it was worked out a second time without the key. Something wrong? Tell us.