Skip to the content
Peabody Teach

Share

This page

Peabody is free and has no ads. Sharing it is the best way to help.

Grade 7 scientific practices: Bridges, drones and big builds: teacher copy

For the teacher

Common mix-ups: students think a failed test means the work was wasted, and that a fair test can change several things at once. A failure point tells the engineer what to fix, and a fair test changes one thing. To support, build the flat sheet first so students see it fail before the folded one. To stretch, ask them to name a criterion and a constraint for a drone. Allow about 50 minutes. Keep the bridge test low to the table.

Reading: bridges, drones and big builds

Name ______________ Date ____________

How can a bridge made of paper hold a heavy load? Engineers solve problems with a design process. First they state the problem. They list criteria, the things a good solution must do, and constraints, the limits on materials, cost and time. Then they brainstorm ideas, build a prototype, test it and improve it. A prototype is a first model used for testing.

Shape matters. A flat sheet of paper bends under almost no weight. Fold it into an accordion pattern or roll it into a tube and it holds much more, because the folds spread the weight out. The load is the weight that a structure carries. Triangles are strong because they do not change shape easily under a load. Many bridges use a truss, a frame built from triangles.

Testing shows the failure points, the places where a design bends or breaks first. A failure is not a waste. It tells the engineer what to fix. To compare designs fairly, change one thing at a time and keep the rest the same. Repeat each test several times. Drone designers use the same steps. They need parts that are strong and light, because a heavy drone needs more battery power.

WordMeaning
criteriaWhat a good solution must do
constraintA limit on materials, cost or time
prototypeA first model used for testing
loadThe weight a structure carries
trussA frame built from triangles
failure pointWhere a design bends or breaks first

Activity: the paper bridge

Materials: three sheets of paper, two stacks of books set 20 cm apart, about 50 pennies, a pencil, a ruler. Steps: 1. Lay one flat sheet across the gap. 2. Add pennies one at a time in the middle. Stop when the paper sags to the table. 3. Record the pennies. 4. Fold a second sheet into an accordion, and test it the same way. 5. Roll a third sheet into a tube and test it. 6. Do three trials of each design.

StepWhat to doSafety
1-3Test the flat sheetKeep the load low to the table
4-5Test the folded and rolled sheetsAn adult is nearby
6Repeat each test three timesDo not lean over the bridge
EndCollect the penniesWash your hands when you finish
DesignTrial 1Trial 2Trial 3
Flat sheet
Accordion fold
Rolled tube

Which design held the most pennies? Where did each one fail first?

Practice 1: recall

Picture word: a truss looks like a row of triangles joined in a line, like a zigzag.

Draw a truss: a zigzag of triangles between two posts.

Choose the best answer.

  1. What is a prototype?a) A first model used for testingb) The final product on salec) A list of materials Answer: A first model used for testing
  2. Criteria area) limits on time and costb) the things a good solution must doc) the pieces of a truss Answer: the things a good solution must do
  3. A constraint isa) a test resultb) a shape made of trianglesc) a limit on materials, cost or time Answer: a limit on materials, cost or time
  4. A load isa) the weight a structure carriesb) the way a bridge looksc) the paper used to build Answer: the weight a structure carries
  5. A truss isa) a round tubeb) a frame built from trianglesc) a flat sheet Answer: a frame built from triangles
  6. Which shape keeps its form well under a load?a) A rectangle with loose jointsb) A flat sheetc) A triangle Answer: A triangle

Practice 2: apply

Choose the best answer.

  1. A flat sheet bends under 2 pennies. The same sheet folded holds 40. Why?a) The folds spread the weight and make it stifferb) Folding adds more paperc) Pennies weigh less on folded paper Answer: The folds spread the weight and make it stiffer
  2. A team may use only three sheets of paper. This is aa) criterionb) constraintc) prototype Answer: constraint
  3. The bridge must hold 30 pennies. This is aa) constraintb) failure pointc) criterion Answer: criterion
  4. In a test, a bridge bends first in the middle. The middle is thea) failure pointb) trussc) load Answer: failure point
  5. To compare two bridge designs fairly, you shoulda) change the paper and the designb) use the same paper and gap and change only the designc) test each one once Answer: use the same paper and gap and change only the design
  6. A drone team picks a strong, light material over a strong, heavy one. Why?a) Light materials are always cheaperb) Heavy materials cannot be strongc) A heavy drone needs more battery power Answer: A heavy drone needs more battery power

Practice 3: explain and compare

Choose the best answer.

  1. Why is a failed test useful?a) It shows which part to fixb) It proves the project is overc) It makes the next test easier Answer: It shows which part to fix
  2. Why repeat each test three times?a) To use up more penniesb) Results vary a little, so repeats show the patternc) To make the bridge stronger Answer: Results vary a little, so repeats show the pattern
  3. Why does a rolled tube hold more than a flat sheet?a) It has more paperb) Tubes are lighter than flat sheetsc) Its shape spreads the weight instead of letting it bend Answer: Its shape spreads the weight instead of letting it bend
  4. Why do bridges use triangles in a truss?a) Triangles resist changing shape under a loadb) Triangles look nicec) Triangles use less paper than lines Answer: Triangles resist changing shape under a load
  5. Bridge A held 12 pennies and bridge B held 30. Only the folds were different. What is the best conclusion?a) Bridge A is strongerb) The folded design held more in this testc) Folding made no difference Answer: The folded design held more in this test
  6. Why build a prototype before the final design?a) Because prototypes must be finished productsb) To skip testingc) To find problems early and fix them cheaply Answer: To find problems early and fix them cheaply

Check

True or false, then choose.

  1. The design process includes testing and improving.TrueFalse Answer: true
  2. A failed test means the work was wasted.TrueFalse Answer: false
  3. A load is the weight a structure carries.TrueFalse Answer: true
  4. A fair test changes several things at once.TrueFalse Answer: false
  5. Which is a constraint?a) The bridge should hold 20 penniesb) Only three sheets of paper may be usedc) The bridge should look tidy Answer: Only three sheets of paper may be used
  6. A truss is a frame built from triangles.TrueFalse Answer: true
  7. After a test shows a failure point, what should the engineer do? Answer: Improve the design (also: fix it, redesign it)